Home>Equipment list>MGY-120H Full Hydraulic Passage Construction Drilling Machine
细节展示放大镜特效

MGY-120H Full Hydraulic Passage Construction Drilling Machine

  • No: MGY-120H
  • Quantity:
    MGY-120H Full Hydraulic Passage Construction Drilling Machine
    The MGY-120H full hydraulic passage construction drilling machine is primarily used for construction in water conservancy, hydropower station passages, including anchor holes, drainage holes, grouting holes, advance holes, and core sampling holes for detection, as well as for the construction of support holes for tunnel pipe scaffolding. It features a feed stroke that can be selected according to the size of the hydropower passage, large drilling capacity, a wide speed range, convenient operation and adjustment of the hole position, and a novel structure.
    Main Technical Parameters
    Drilling Diameter (mm) / Drill Rod Specification (mm): Φ250~Φ146 / Φ89×1500
                                                                     Φ168~Φ127 / Φ76×1500
                                                                     Φ127~Φ75 / Φ50×2000
                                                                     Other specifications can be customized according to the mast length and power head stroke.
    Drilling Angle (°): 0 ~ 360 (any angle can be constructed)
    Maximum Stroke of the Power Head (mm): 2200 (can be customized to 1500 according to the passage size)
    Output Speed of the Power Head (r/min):
    - Standard 490 horsepower motor, high speed 950N.m: Single pump 155~127 r/min, dual pump 315~280 r/min
    - Low speed 6100 N.m: Single pump 24~20 r/min, dual pump 49~44 r/min
    - Standard 195 horsepower motor, high speed 370N.m: Single pump 399~328 r/min, dual pump 805~697 r/min
    - Low speed 2400 N.m: Single pump 62~51 r/min, dual pump 125~108 r/min
    Maximum Pull-back Force of the Power Head (kN): 63 (at rated pressure) 79 (at adjustable high pressure)
    Maximum Feed Force of the Power Head (kN): 44 (at rated pressure) 55 (at adjustable high pressure)
    Main Machine External Dimensions (Length × Width × Height): Drilling machine in transport state: 4860×1920×2100mm
    Estimated Weight of the Drilling Machine: 4900kg (total weight for construction)
    Drilling Machine Track Climbing Capability: Not more than 15°
    Drilling Machine Walking Speed: 3 km/h
    Drilling Machine Track Ground Pressure: 0.05 MPa